Language:中文  English

Company News

The Longgang Garden four projects on schedule

Date:2012-06-05 11:47  PV:950

The Longgang Garden four projects on schedule
— Management system played a crucial role in

    SEA&STAR CONSTRUCTION GROUP CO.LTD., the second project management department, responsible for the building of the the Longgang garden four engineering. Strict management and construction of the project department staff have been working, making the progress of this project, prancing strides.

    Until the end of this month, the Longgang garden four works four main G12B residential, 14 layers of flat-slab concrete pouring completed; The G12C the thirteen residential wall studs steel lashing completed; G15 residential 12-storey flat-slab formwork construction is completed; G16 residential thirteen wall studs steel banding is complete. The masonry part G12B three masonry has been completed; The G12C three masonry complete; G15, G16 masonry construction has already begun. Seeing the encouraging results of these ever-changing, very few people can think managers have to pay how much effort and time.
The second project department insisted driven by enthusiasm for production management system, the company's system as the behavior caliper, rewards and punishment, the staff the wrong system to follow, outstanding performance, encourage standards, making clear direction, all of them fighting spirithigh-spirited morale.

   Zhezhi enviable strong team, after a long period of experience, the grinding of the management system, and continue to beat to take the results today, became a pioneer in the industry.

 

All Rights Reserved: SEA&STAR CONSTRUCTION GROUP CO.LTD
Tel:0417-6251997  Address: Part B of Green Industrial Park at Ba Yuquan Yingkou in Liaoning Province.