Language:中文  English

Company News

SEA&STAR WOOD CO.LTD work conference held in 2012

Date:2012-02-22 11:03  PV:918

February 7, 2012, the first working day after the Lantern Festival, SEA&STAR WOOD CO.LTD was held in the meeting room of the Company in 2012 the first working meeting, a meeting to clear personal direction of the work is the main goal, employees at the meetingthe recommendations for the development of enterprises.

     The meeting was chaired by the assistant to the general manager of the Wood Company Cheng Shuai. Beginning of the meeting Machinery Safety Officer Zheng Hang first read the work plan: to improve the internal management of the Ministry of Security, improve staff quality; fire drills planned in May and June; development of safe production duties; make a record of equipment to strengthen the maintenance, finishing tool;safety education and disseminate occupational hazards. Zheng Hang recommended that two applications for security staff in the sector.
General Manager Zhang Renjie Zheng Hang work plan: various programs to do the problem decomposition, arrange specific time; mechanical operating procedures to work out the text system; mechanical maintenance procedures; required to wear protective safety and occupational health,appliances; hold regular fire drills, fire-fighting equipment should be checked daily to ensure complete; establishment and determine the system's security responsibilities; Tool to sort and good maintenance records; prepared with great difficulty loss machine parts; good new employees into the pre-service training, including the training of the management system; process handsome Assistant also put forward their own proposals: Mechanical safety is a top priority, posts and use of personnel to timely communication and good anticipation. Quality inspection team leader Wang Hongbo set forth in the work plan: To improve the quality of consciousness; good product packaging for easy installation personnel construction; good communication between various departments; learning to improve the processing technology; And recommendations: design review problems promptly notify; the workshop manufacturing processes, some of the processing to be completed ahead of schedule so that the post-test; the advance processing prior notice; need to add a quality control personnel. The Manager of Quality Supervision, Inspection squad leader Wang Hongbo recommendations: the implementation of the system of personal responsibility, quality control should bear the main responsibility for the quality, quantity and structure of export products, there should not be mistakes
General Manager Zhang Renjie suggested: project accountability to refine, to establish quality standards (export and domestic); establishment of production records; procedure is documented communication between the various departments; quality control workflow to re-adjust. Cheng Assistant suggestions: do export products to the characteristics of the order.

    Jia Hua Qiang, director of the workshop production plan: to improve the professional knowledge, improving their quality; improve production efficiency, everyone do "to plant at home";
Strengthen management, and compliance with the implementation of rules and regulations; improve staff quality and working status; Zhang suggested: I hope that the quality of each employee are improved; enhancement of production efficiency need to master the mechanical efficiency; overtime hours as of year-end bonuses and excellent staff selectionstandards; managers do not allow cliques, good to explore the expertise of the staff;
Mobilization of employee enthusiasm; wear a work card, administrative department responsible for checking the dormitory system; posts well before the clean-up and inspection of the equipment, waste clean-up in a timely manner; the execution squad accommodation staff play a leading role; process assistant proposals: nexus post, dormitories and health to do more supervision, perform the quarters off time according to a certain system.

     The technology squad Wu Jixiang work plan: new equipment to improve production efficiency, the selection of the wood to strict quality control; good communication on the maintenance and operation of the new equipment; recorded in the day-to-day work of the functioning of the new equipment;
Zhang suggested: the management team of the new equipment should be concerned about the safety classes to actively participate in the observation of the operation of state; training other operators prepare for the shift; establish operating procedures to achieve proficiency in operation; master new equipment, old equipment performance;The Manager recommends that: make a record, good communication with foreign experts.

LI Xiao-ship statement: communication design changes for discussion. Zhang recommendations: the preparation of a unified file name; make a record table, production problems, timely reflection of the change.Librarians Yao Chunli work plan: to improve their professional level and a better understanding of product models; warehouse has its own custody account properly documented into the deposit and dynamic; Stock Status feedback to managers and leaders at all levels on a regular basis,do a good job the stocking; good variety of storage products, classification and acceptance, if any damage, and quality problems in a timely manner and purchase communicate; strict customs inspection ; Good products out of the library; do a good job the picklists and back requisition fill; warehouse in accordance with the principles of safe, convenient, saving; managers recommended: requisitioned tools do a good job for the record, the tools compensation case system in line with local conditionsprocessing; the learning tape measure usage.
Zhang suggested: good tool to prepare the premise of the work, the recipients, as the case may be; develop the management system of the underlying instrument; the tape measure EXACT tools to do a batch reunification.

     Engineering Department Ban Chang Bai Xin work plan: improving safety at construction; learn professional knowledge; enhance the sense of team. Recommended: the establishment of the items custodians, to avoid unnecessary waste; design changes in advance notice.

    Engineering Department squad Zhangyao Hai work plan: to ensure quality, shorten the construction period, to solve problems in a timely manner; good timber storage, attention to weather changes; timely detection of problems and avoid brought to the construction site.

The Engineering Department squad leader Zheng Zhuang work plan: improving their own work; customers' satisfaction; improve standards; improve work efficiency; recommends: drawings unclear flag, avoided in the future; able to solve the problem of the factory, to avoid brought to the construction site.

     In addition, the company's trade department, design department, production department and engineering department employees a summary of their last week of work, and the next step work plan for the detailed analysis and careful arrangements.
Zhang Renjie, general manager of the company's tube views:
Matters, awareness needs to be improved: to learn more expertise, the squad leader to do the work independently; enhance the quality awareness of the procurement of goods and installation products; assessment of the progress of the installation, working hours; installation to do field civilization facilities Notepurposes: the civilized construction license; custody of the materials, packaging and other issues; usually pay attention to inspection; achieve communication and rapport with the Party; dress, slogans, flags to achieve the unified arrangement; foreign personnel management; Fourth, improve productthe quality of the installation; V. safe installation the most important safety measures wearing complete.

    SEA&STAR WOOD CO.LTD from the establishment to the present, always adhere to regularly organize various departments Conference of communication, production and sales related matters frequent exchanges, so that the company's day-to-day management of a chain, the development of the company to establish a sound management systemin this regiment system assistance, under the joint efforts of all staff, starfish Wood Company in the domestic market has made remarkable achievements.
Also received a lot of long-term cooperation orders in foreign markets. 2012 the SEA&STAR WOOD CO.LTD will to a new level, to achieve a new leap forward.

 

All Rights Reserved: SEA&STAR CONSTRUCTION GROUP CO.LTD
Tel:0417-6251997  Address: Part B of Green Industrial Park at Ba Yuquan Yingkou in Liaoning Province.